Mill Process Flows

YouTube: Mill Process Flows in Production

🧵 Complete Mill Processing Workflow Guide

This tutorial walks you through the end-to-end mill processing workflow🎯, including mill setup, fabric stock management, inter-location transfers, waste tracking, and reporting. The process is essential for manufacturers who outsource dyeing, printing, or finishing operations to external mills.


🏭 Step 1: Mill Setup

Before issuing any fabric for processing, the system must recognize the mill as a valid location.

🔍Why this is important:

Setting up a mill as a storage or processing location (also known as a "Godown" or warehouse) ensures traceability📦 and enables seamless stock movements between your factory and third-party job workers.

📋Instructions:

  1. 🛠️Navigate to the Setup section, then click on Set Other Item Details and select Setup Godown.

  2. ➕Click on Create New Godown.

  3. ✍️Enter the following details:

    • Mill Name (e.g., Sunrise Dye Works)

    • Short Name / Code (e.g., SDW01) for quick reference in dropdowns and reports

  4. 💾Save the setup.

Once saved, this mill will appear in stock transfer options🔁, ledgers📘, and reports📊.


🧾 Step 2: Record Grey Fabric Stock (Purchase Entry)

You cannot issue fabric to a mill unless it is available in your system’s inventory📦.

🔍Why this matters:

Grey fabric is the raw material that will be dyed or finished at the mill. Logging it properly ensures accurate stock valuation and availability.

📋Instructions:

  1. Navigate to the Purchase Voucher📑.

  2. 🆕Create a new purchase entry for the Grey Fabric received from your supplier.

  3. Input:

    • 🧾Supplier/Vendor Name

    • 🧵Fabric Item Name (e.g., 100% Cotton Grey 60x60)

    • 📏Quantity and Unit (e.g., 1,000 meters)

    • 💸Purchase Rate per unit

    • 🧾Invoice Number and Date

  4. 💾Save the document.

💡 Now the fabric is available in your main warehouse and ready to be issued for processing.


🔄 Step 3: Transfer Grey Fabric to Mill

Now that the grey fabric is in stock, it needs to be sent to the designated mill for job work such as dyeing🎨, printing🖨️, or finishing✨.

🔍Purpose:

This step documents the stock movement and helps generate reports📊 on material sent out for processing.

📋Instructions:

  1. Navigate to the Inventory section in the Main menu, then select Stock Transfer - Godown Wise option.

  2. 🆕Create a new transaction and select:

    • 🏭Mill (from the list of Godowns)

  3. ➕Add the grey fabric item(s) being issued.

    • 📏Input Quantity, Unit, and optionally link🔗 it to a Job Order.

  4. 💾Save and post the transaction.

📦 This action reduces the stock from your warehouse and moves it to the selected mill’s inventory📉.


🎨 Step 4: Receive Dyed Fabric from Mill

After job work is complete, the processed fabric must be brought back into your inventory with updated value and attributes.

🔍Why this is critical:

This step ensures the transformed product is properly recorded🏠 with its new characteristics (e.g., color🟦, finish🧽), and waste or losses during processing are accounted for.

📋Instructions:

  1. Navigate to the Inventory section and click to open Job Work - Receipt against Issue window.

  2. Now, click on document📂 from Menu bar, and click to Retrieve from Godown Stock Transfer.

  3. From the Stock Transfer Search window, choose the original issue document🔍 used to send fabric to the mill.

  4. Click OK to load the transfer record.

  5. 🆕Enter details of the Dyed or Finished Fabric Received:

    • 🎨New Item Name (e.g., Dyed Cotton Fabric – Navy Blue)

    • 📦Quantity Received

    • 💰Cost per Unit

    • 🧮Allocated Quantity (how much is assigned to production or storage)

  6. 💾Save the document.

🗑️Auto Waste Calculation:

  • The system will automatically compute the Waste Quantity as:

    Waste Quantity = Quantity Received - Allocated Quantity
  • 📉This helps track material loss and improves process optimization.

📈 Recording these details accurately also affects cost calculations, stock availability, and production planning.


📊 Step 5: Reports & Tracking

Your ERP system should provide two essential reports📁 to manage and monitor mill activity.

1. 📦Grey Fabric Inventory – Mill Wise

  • Tracks current stock of unprocessed (grey) fabric issued to each mill.

  • Useful for identifying delays or bottlenecks in job work🚧.

2. 📤Job Workwise Issue vs. Receipt Report

  • Shows how much fabric was sent to each mill.

  • Displays what has been received back, and what is still pending.

  • Provides lot-wise and mill-wise transparency.

🧮📈 These reports are key for reconciliation🧾, vendor accountability📋, and production forecasting📆.


✅ Final Summary of the Mill Process Flow

Step
Description

1

🏗️Set up mill in system via Godown configuration

2

🧾Record grey fabric receipt via purchase entry

3

🔄Transfer grey fabric to mill for job work

4

🎨Receive dyed/finished fabric from mill

5

📊Track performance using inventory and job work reports


🧷 Best Practices & Recommendations

  • Always verify mill details before transferring stock to avoid misallocation.

  • Cross-check received fabric against issued lots to avoid discrepancies.

  • Monitor waste🗑️ percentages regularly to flag inefficient processing or damage.

  • Use job order references🔗 to link fabric movements directly to sales or production batches.

  • Set up alert systems or reminders📅 for pending receipts from mills.

Last updated