# Initiate Production Through Issue for Processing - First Process

**YouTube:** [How to Initiate Production Through Issue for Processing - First Process?](https://www.youtube.com/watch?v=jrGxngNCz2U)

## How to Initiate Production Through Issue for Processing - First Process?

In this tutorial, we will learn how to initiate the **first process in production** using the **Issue for Processing** feature in **Logic ERP**.\
This process marks the beginning of the production cycle after creating a **Job Order**.

***

### **Create a Job Order**

The **Job Order** represents the **planning stage** of production — where you define what needs to be produced, for whom, and how.

#### **Open Job Order**

Navigate to the Production\Production Vouchers and then select **"Job Order".**\
Under the **Assigned To** field, choose whether the process will be handled:

* By a **Worker** → for in-house processing, or
* By a **Party** → for outsourced processing.

<figure><img src="/files/WzZZ2igUFdjDD54RaGPc" alt=""><figcaption></figcaption></figure>

* Let’s proceed with creating a **Job Order for an external party.**
* Select the **Party Name**, and if required, enter additional details such as **Remarks** or **Job Order Instructions**.

<figure><img src="/files/hOQNaV90r1H3IGZvHtNR" alt=""><figcaption></figcaption></figure>

#### **Add Items and Quantities**

Enter the items to be produced along with their required quantities.\
You’ll notice a **color flag** next to each item:

* The **Green Flag** indicates that the **raw material is available**.

<figure><img src="/files/QezFVUhVECWP4PmcHfww" alt=""><figcaption></figcaption></figure>

You can view raw material details by clicking **Raw Material Details**, which displays:

<figure><img src="/files/z8EHxzvxPmpRrS5MDTse" alt=""><figcaption></figcaption></figure>

* Total raw material requirement.
* Virtual reserved stock (based on pending purchase or production orders).
* Specifications like **Size**, **Shade**, and **BOM structure.**

<figure><img src="/files/Hrsjksn85kqXHYuWggdJ" alt=""><figcaption></figcaption></figure>

* From here, you can add or edit **Raw Materials, BOM Expenses, and Process-wise Rates** as per your requirements.

<figure><img src="/files/tDDspZzB97w44u0aOW3b" alt=""><figcaption></figcaption></figure>

* Modify **Raw Material Specification**&#x20;

<figure><img src="/files/wbAooz4H9gpbMCB0UhP1" alt=""><figcaption></figcaption></figure>

* Setup **BOM Expenses**

<figure><img src="/files/745xyaY7YuPkoQAIBkhR" alt=""><figcaption></figcaption></figure>

* Update **Item Rates Per Process**&#x20;

<figure><img src="/files/8prc0I2CclzUfvPbpVXz" alt=""><figcaption></figcaption></figure>

**Note:** These changes apply only to the current job order.

Once all details are verified, **click Save** to record and finalize the job order.

***

### **Issue for Processing – First Process**

The **Issue for Processing** marks the **first stage of the actual production**.\
It defines which styles, designs, or quantities are being released for processing.

**a. Select Party or Worker**

Choose whether the work is handled **internally (Worker)** or **externally (Party)**.\
When issued to a **Party**, it is also referred to as a **Purchase Order Issue**.

<figure><img src="/files/jF7mBpE4ZDgiEXQvh4hq" alt=""><figcaption></figcaption></figure>

**b. Define Process Details**

* Select the **Party Name**
* Choose the **Process** to be initiated
* Enter the **Processing Rate**
* Select the **Relevant Job Order**

<figure><img src="/files/UfSD1ZgeREF2WE9VppMc" alt=""><figcaption></figcaption></figure>

The total quantity from the job order will be automatically retrieved.

> A single Job Order can be divided into multiple **Issues for Processing**, allowing production to be executed in **smaller batches** or across **multiple dates**.

<figure><img src="/files/kjDoGDWglVik7HpVVzpI" alt=""><figcaption></figcaption></figure>

Enter the required quantity (e.g., 50 pieces per batch) and **Save** the document.

***

### **Issue Raw Material for Processing**

After issuing the process, the next step is to **issue raw materials** required for production.

#### **Open Module**

Go to **Raw Material Issues Against Job Order (External)**.

This module is used by the **Stores Department** to issue materials to external vendors or job workers.

### **Select Job Order and Production Issue**

Select:

* The **Job Order**, and
* The corresponding **Production Issue** (also known as the Purchase Order Issue).

<figure><img src="/files/ipmXByFKpF3vQVQDn3YP" alt=""><figcaption></figcaption></figure>

* Press **F8** to calculate and retrieve the required raw materials.\
  Click **Refresh** — the system will fetch all materials based on the **Bill of Materials (BOM)**.

<figure><img src="/files/7GUU8dRfHz0MLpvEiPjT" alt=""><figcaption></figcaption></figure>

* Click on Save button.
* Raw material issues can be made **process-wise**, ensuring accuracy in consumption tracking.

<figure><img src="/files/n6Ma4aZttXclECw2dN7Y" alt=""><figcaption></figcaption></figure>

> **Important:**\
> When raw materials are issued to an external party, it is mandatory under GST to file **Form ITC-04** to report these transactions.

***

### **Generate GST Form ITC-04**

**Open GST Returns Module**

* Go to **GST Returns**
* Select return type as **GST ITC-04**
* Click **Show**, and specify the **date range**
* Click **Generate**

<figure><img src="/files/lqCfAnJtCVVcwRmE188M" alt=""><figcaption></figcaption></figure>

The system will display all relevant data for issued materials.\
After verification, you can either:

* Prepare a **JSON file** for upload to the GST Portal, or
* **Export the data to Excel** by clicking **Upload**

***

### **Receive Against Issue**

Once the processing is completed, you can record the **receipt of semi-finished goods**.

**Open Module**

Navigate to **Receive Against Issue (External)**.

Select:

* The **Party** from whom goods are received
* The corresponding **Process** (e.g., Cutting)

<figure><img src="/files/rlFCSWJhG7iGyhZoE7g7" alt=""><figcaption></figcaption></figure>

* Click **Add Issues.**

<figure><img src="/files/ZKPsna3ZWR3vCWNlkpSH" alt=""><figcaption></figcaption></figure>

* Select the **Job Order**, choose the **Item**, and click **OK**.

<figure><img src="/files/4Jbejmf3YRsodI6EGuD3" alt=""><figcaption></figcaption></figure>

**Record Material Consumption**

* Use the **RM Consumption** button to record:

<figure><img src="/files/Ap32TMmtFZg2hevfkRGM" alt=""><figcaption></figcaption></figure>

* **Raw material consumption**
* **Returns or wastage**

<figure><img src="/files/MuXq3PbkDfirXvJ0OOig" alt=""><figcaption></figcaption></figure>

* This ensures accurate production costing and resource tracking.
* Finally, **Save** the document.

***

### **Result**

You have successfully learned how to:

* Create a **Job Order**
* Perform **Issue for Processing (First Process)**
* **Issue raw materials** to job workers
* Generate the **GST ITC-04** report
* Record **Receipts Against Issue**

This process ensures a smooth, compliant, and traceable production flow in **Logic ERP**.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://kb.logicerp.com/logic-erp-installation-configuration-and-troubleshooting-solutions/faqs/production/initiate-production-through-issue-for-processing-first-process.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.