> For the complete documentation index, see [llms.txt](https://kb.logicerp.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://kb.logicerp.com/logic-erp-learning-hub-tutorials-and-best-practices/production/production-vouchers/job-order/job-order-configuration/raw-material-rates.md).

# Raw Material Rates

**YouTube:** [How to Configure Rates Displayed in Raw Material Details in Job Orders](https://youtu.be/ixgUX2LWoj0)

## How to Configure Rates Displayed in Raw Material Details in Job Orders?

In this tutorial, we will learn how to configure the source and rate type for automatically picking **Raw Material Rates** in Job Orders. Logic ERP allows you to pick rates either from the **Item Master** or the **Lot Master**, helping ensure accurate and consistent raw material costing.

***

### Objective of This Feature

* Automatically pick raw material rates during Job Order entry
* Pick rates from the **Item Master** or **Lot Master**
* Support different rate types as per business requirements
* Reduce manual rate entry
* Improve raw material costing accuracy

***

### Access to the Job Order Configuration

* Go to the **Configuration Window**
* Navigate to the **Raw Material Settings** section
* Here, you will find the **"Raw Material Rates"** option with two choices:

<figure><img src="/files/ZRFhTZCBnnrq8YSY4xLE" alt=""><figcaption></figcaption></figure>

* **Item Master** – Picks the selected rate from the Item Master.
* **Lot Master** – Picks the selected rate from the latest transacted Lot.

<div><figure><img src="/files/r60uiAd17Sf9W3kj2LKF" alt=""><figcaption></figcaption></figure> <figure><img src="/files/w0uJNEirZNvIPF7xA02i" alt=""><figcaption></figcaption></figure></div>

***

### Pick Rate from Item Master

* Select **Item Master** under Raw Material Rates.
* Choose the required **Rate Type** from the dropdown, such as **MRP**.
* Save the configuration.

**Create a Job Order**

* Initiate a **New Job Order** entry.
* Transact the required item.
* Click on **Raw Material Details**.

<figure><img src="/files/uyYBrZqy5h548pCxJqpi" alt=""><figcaption></figcaption></figure>

**Result**

The raw material **MRP is automatically picked from the Item Master**.

#### Verify the Item Master Rate

* Open the **Item Master Setup** window.
* Search for the same item.
* Navigate to the **Pack Details** section.
* Under **Item Rates**, review the MRP defined for the item.

<figure><img src="/files/ipmz8zim2QQffveeaLIu" alt=""><figcaption></figcaption></figure>

As **MRP** was selected in the configuration, the same rate is automatically reflected in the Job Order's Raw Material Details.

***

### Pick Rate from Lot Master

Now, let's change the rate source from the Item Master to the Lot Master.

* Return to the **Configuration Window**.
* Set **Raw Material Rates** to **Lot Rates**.
* Select the required **Rate Type**, such as **Basic Rate**.

<figure><img src="/files/wZnJP6GyY7ulKVvXN0J1" alt=""><figcaption></figcaption></figure>

* Save the configuration.

**Create a New Job Order**

* Initiate a new Job Order entry.
* Transact the same item.
* Open **Raw Material Details**.

<figure><img src="/files/KbRnHd0hI6t273o6mdN0" alt=""><figcaption></figcaption></figure>

**Result**

* The system automatically picks the **Basic Rate from the latest transacted Lot**.

#### Verify the Lot Master Rate

* Open the **Purchase Voucher** window.
* Open the **Lot Details** section.
* Check the latest purchased Lot.

<figure><img src="/files/aUE0Lo2HEZSmpn6uIdC8" alt=""><figcaption></figcaption></figure>

Since **Basic Rate** was selected in the configuration, the Job Order picks from the latest Lot.

***

### Pick Sale Rate from Lot Master

The Lot Master can also be used to pick other rate types

* Return to the **Configuration Window**.
* Keep the source as **Lot Rates**.
* Change the **Rate Type** from **Basic Rate** to **Sale Rate**.

<figure><img src="/files/WL4OYZQWenrQzSu3YDM5" alt=""><figcaption></figcaption></figure>

* Save the configuration.

**Create Another Job Order**

* Initiate a new Job Order entry.
* Transact the required item.
* Open **Raw Material Details**.

<figure><img src="/files/YMuK9SC155jK5WC7akkW" alt=""><figcaption></figcaption></figure>

**Result**

The system now automatically picks the **Sale Rate** from the Lot Master.

***

### Key Benefits

* **Flexible Rate Source:** Pick rates from Item Master or Lot Master.
* **Automatic Rate Pickup:** Eliminates repetitive manual rate entry.
* **Accurate Costing:** Uses predefined rates for raw materials.
* **Latest Lot Support:** Automatically picks rates from the latest transacted Lot.
* **Improved Efficiency:** Simplifies Job Order processing and reduces errors.

***

### Best Practice Tips

* Use **Item Master** when standard item-wise rates should be applied.
* Use **Lot Master** when the latest purchased Lot rate should be considered.
* Select the appropriate **Rate Type** according to your costing requirements.
* Verify the configured rate source before creating Job Orders.

***

### Final Outcome

After configuring **Raw Material Rates**, Logic ERP automatically picks the required raw material rate from the selected source—**Item Master or Lot Master**—based on the configured **Rate Type**. This ensures faster Job Order entry, consistent costing, and accurate raw material valuation.

<br>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter, and the optional `goal` query parameter:

```
GET https://kb.logicerp.com/logic-erp-learning-hub-tutorials-and-best-practices/production/production-vouchers/job-order/job-order-configuration/raw-material-rates.md?ask=<question>&goal=<endgoal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is optional and describes the broader end goal you are ultimately trying to accomplish on behalf of the user. GitBook uses it to tailor the answer towards what is most useful for that goal.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.