Production WIP Reconstruction

How to Rebuild the Production Work-in-Progress Values?

In this tutorial, we will learn how to use Production WIP Reconstruction to bring the production work-in-progress (WIP) values up to date after Job Orders have been costed. The window opens with the title Re-Construct Production WIP Values.

  • The WIP value built here is used by Trading Account - Balance Sheet Groups and Balance Sheet - Balance Sheet Groups when their option Include Production WIP Stock Value is ticked.

  • The Job Order Wise Work In Progress report works out WIP itself, but it uses the rates this utility writes on issues, returns and goods received.


Before You Start

  • Take a backup of the company data first. This utility overwrites rates and values that are already saved, and cannot be undone.

  • Run Update Job Order + Process Wise Net Cost first. This utility takes the raw material cost per piece from the last Job Order costing. It does not run the costing itself and does not check that it has been run.

  • Only a supervisor can run it. For other users the Reconstruct button is disabled.

  • Run it when no one is entering production, issues or receipts.


Open the Utility

  • Navigate to Production\Production Utilities and select Production WIP Reconstruction.

  • The Re-Construct Production WIP Values window opens.


Choose the Year and Branches

  • Select the Fin Year. It defaults to the current financial year. The utility works on one financial year at a time.

  • To limit it to some branches, tick Branch Selection and pick the branches.


Run the Reconstruction

  • Click Reconstruct.

  • If no year is selected, Logic ERP shows Please select Fin Year....

  • Logic ERP asks Start Re-Construction... — click Yes to continue. The default answer is No.

  • The status bar shows the progress, for example Updating Rates - RM Issues and the production entry being updated, and then Done...

  • There is no Cancel. The window cannot be closed until the run finishes.


What the Utility Changes

For the chosen year and branches, it:

  • re-values raw material issues to Job Orders at the raw material rate chosen in the costing settings (RM Rate From and RM Rate As, set on Update Job Order + Process Wise Net Cost);

  • re-values raw material returns from Job Orders at the same rate;

  • sets the raw material cost per piece on production entries that add goods into stock, and on the production entries behind Stock Receipt - Production entries, from the Job Order costing;

  • rebuilds the WIP values: issues − returns − value received into stock.

The rates are updated first and the WIP values are rebuilt after, together: the run either finishes completely or changes nothing. If anything fails, an error message is shown and the rates and WIP values stay as they were. It is safe to run it again for the same year — use the same branch selection.


Points to Remember

  • A production entry with no Job Order costing behind it keeps the raw material cost it already has. Cost the Job Order first, then run this utility, so that the entry gets the right cost.

  • Run it once for each financial year that needs it.

  • For how WIP is calculated and why it may not come to zero, see Job Order Wise Work In Progress.