Setup BOM Expenses

How to Set Up BOM Expenses and Apply Them to a Job Order?

In this tutorial, we will learn how to define BOM Expenses in Logic ERP and how they are added to the cost of a Job Order. BOM Expenses are charges over and above raw material and processing — for example overheads, logistics, washing, a rejection allowance or a margin. Each expense can be a percentage or an amount per piece, and can be added to or subtracted from the cost.

For how BOM Expenses fit into the full cost of a Job Order, see Job Order Costing - Concepts.


Open Setup BOM Expenses

  • Navigate to Production\Production Setups and select Setup BOM Expenses.

  • The grid lists every expense with these columns:

    • SNO.

    • EXPENSE NAME — typed in capitals. Every expense needs a name, and two expenses cannot have the same name.

    • EXPENSE TYPE — Percent Wise or Per Unit Wise.

    • EXPENSE / UNIT — used only for Per Unit Wise expenses (see below).

    • DEFAULT VALUE — the percentage, or the amount.

    • BASIC OR CUMULATIVE — what a percentage is calculated on (see below).

    • ADD OR LESS — + adds the expense to the cost, - subtracts it.

  • A new line starts as Percent Wise, EXPENSE / UNIT 1, Basic and +, with DEFAULT VALUE blank.


Per Unit Wise Expenses

  • For a Per Unit Wise expense, DEFAULT VALUE is the amount for the number of pieces in EXPENSE / UNIT.

  • Logic ERP works out the amount for a single piece from these two values.

  • Example: EXPENSE / UNIT 12 and DEFAULT VALUE 48 means ₹48 for 12 pieces, which is ₹4 per piece.

  • On a Job Order, the per-piece amount is multiplied by the Job Order quantity.


What a Percentage Is Calculated On

The BASIC OR CUMULATIVE column decides the base for a Percent Wise expense:

  • Basic — raw material + processing.

  • RM Value — raw material only.

  • Processing Value — processing only.

  • Cumulative — raw material + processing + every expense line above it. A line marked - above it reduces the base.

Every expense amount is rounded to 2 decimals. On the Job Order and in the Cost Sheet, each raw material line is rounded to 2 decimals before it is added into the base.


Set the Order of the Expenses

The order of the lines matters for Cumulative expenses, because each one is calculated on everything above it.

  • Save the expenses first — the order window lists only saved expenses, and changes not yet saved in the grid are lost when it closes.

  • Click Expense Order.

  • In the Set BOM Expense Order window, arrange the expenses in the order they should be calculated and click Save in that window. Set in Alphabetical Order puts them in name order.

  • The grid then lists the expenses in this order.


Save and Delete

  • Click Save and confirm to save the expenses.

  • An expense that is already used on a Job Order cannot be deleted. Logic ERP shows Details Exists Against Expense followed by the expense name.


Apply the Expenses to a Job Order

The expenses defined here are defaults. Each Job Order holds its own copy, which can be changed for that Job Order.

  • Open the Job Order and click Raw Material Details.

  • In the Job Order Wise Raw Material Details window, click BOM Expenses.

  • The Setup BOM Expenses Details window opens. On a new Job Order it is empty.

  • Click Refresh from Master to bring in the expenses from Setup BOM Expenses that are not yet on this Job Order.

  • Change the type, EXPENSE / UNIT, DEFAULT VALUE, base or + / - for this Job Order if needed, or add another expense from the master on a new line.

  • Click Expense Order to change the order for this Job Order (window Set Expense Order), then click Save.

  • The changes are stored with the Job Order when you accept the Raw Material Details window and save the Job Order.

To control saving a Job Order without BOM Expenses, use the Job Order configuration option BOM Expenses Entry As: Prompt If not Exists asks before saving, and Do not Allow saving If not Exists stops the save.


Worked Example

Example — cumulative expenses on a Job Order

Priya's Job Order is for 1 jacket. Raw material is ₹232.75 and processing is ₹68, so raw material + processing = ₹300.75. The expense lines, in this order, are:

Expense
Type
Base
Amount
Running total

Raw material + processing

₹300.75

OVERHEAD

50%

Processing Value

₹34.00

₹334.75

FACTORY OVERHEAD

50%

Processing Value

₹34.00

₹368.75

LOGISTICS

₹4 per piece

—

₹4.00

₹372.75

TRIMS

₹2 per piece

—

₹2.00

₹374.75

LINING

₹3 per piece

—

₹3.00

₹377.75

PACKING

₹3 per piece

—

₹3.00

₹380.75

WASHING

₹10 per piece

—

₹10.00

₹390.75

REJECTION

2%

Cumulative

2% of ₹390.75 = ₹7.82

₹398.57

MARGIN

10%

Cumulative

10% of ₹398.57 = ₹39.86

₹438.43

The cost of the jacket is ₹438.43. REJECTION is calculated on everything above it, not only on the line just before it. MARGIN then includes REJECTION.


How BOM Expenses Reach the Actual Cost

  • When the Job Order is costed (see Update Job Order + Process Wise Net Cost), the expenses are calculated on the Job Order's actual raw material used and processing (including process Overhead(%)), and per piece expenses are multiplied by the Job Order's costing quantity.

  • The total of the expenses is added to the cost per piece of the Job Order.

  • It is shared between the finished items by each item's share of the quantity, unless Do not use finished Item weightage for Cost Calculation is ticked.

  • The Cost Sheet report calculates the expenses in the same way, but on the Job Order's planned raw materials and process rates, and multiplies per piece expenses by the Job Order's ordered quantity.