Material Receipt Note (MRN) Process

YouTube: WMS – Material Receipt Note (MRN) Process?

WMS – Material Receipt Note (MRN) Process?

In this tutorial, we will learn about the MRN (Material Receipt Note) Process in WMS.

After completing the procurement process, the next step is to create an MRN. The MRN process is used to verify the material received from the supplier and record the accepted quantities in the system.

We will also learn how to record any shortage, rejected, or replacement material identified during the quality checking process.


Access to the Purchase Challan

  • Before creating the MRN, we need to verify one configuration.

Configuration

  • Open the Purchase Challan window and click Configuration.

  • In Setup Purchase Configuration, open the Other Settings-3 tab.

  • Locate the option labeled as:

Order Reterival

Make sure the Order Reterival option is set to Delivery Note.

This configuration allows us to retrieve the material received through the Delivery Note created in the previous step.


Create the Material Receipt Note

  • Open the Purchase Challan window.

  • Select the required Supplier.

  • Proceed to the Item Details section.

  • Click on Retrieve Order.

  • In the Reterive Orders/Cartons window, choose P.Order / Delv Note.

  • Search for and select the Delivery Note created in the previous procurement step.

The system will retrieve the items associated with the selected Delivery Note. Only the quantity still pending on the Delivery Note is brought in, so a Delivery Note can be received in parts.

A Delivery Note that is still pending for approval cannot be retrieved; the message "Delivery Note:… is pending for approval. Cannot Retrieve." is shown.


Verify the Received Material

Once the items are retrieved:

  • Select the items you want to receive. The item selection list is shown when Allow Item Selection in PO Reterival (Other Settings-1) is ticked; otherwise every pending item of the Delivery Note comes in.

  • Verify the Item Details.

  • Check the Received Quantities.

  • Confirm that the material details match the physically received goods.

After verifying all the details, save the entry.

System Behavior

The saved Purchase Challan acts as the Material Receipt Note (MRN) and records the material received from the supplier.

This completes the material receipt and verification stage.


Record Rejected or Replacement Material

During the quality checking process, some material may be found to be short, damaged, defective, or otherwise rejected.

To record such material, navigate to:

Navigation Path

Main Menu → Purchase → Rejection/Replacement Document against Purchase

  • Open the Rejection/Replacement Document against Purchase window.

  • Click on Purchase Challan.

  • Search for and select the Material Receipt Note created in the previous step.

  • Select the item for which you want to record a rejection or replacement.


Enter the Rejection Quantity

Enter the required quantity against the appropriate Rejection Type: REJECTED, SHORTAGE or REPLACEMENT. For each entry, choose the Reason Type and Reason. The reasons are created in Setup\Configurations\Setup Reasons for Purchase Rejection/Replacement.

For example:

  • Total received quantity = 10 units

  • Rejected quantity = 2 units

  • Accepted quantity = 8 units

In this case, enter 2 as the rejected quantity against the respective rejection type.

Once all the required details have been entered, save the voucher.

Result: The rejection or replacement entry is successfully recorded against the selected Material Receipt Note.

The whole document can also be rejected with Reject Document, or approved without any rejection with Approve W/O Rejection. The rejected and short quantities are later returned to the supplier through Purchase Return, using Reject./Repl (see Rejection/Replacement Document Against Purchase).


WMS Procurement and MRN Flow

The complete process covered so far can be summarized as:

Purchase Order → Delivery Note Against Purchase Order → MRN / Purchase Challan → Quality Verification → Rejection / Replacement

Final Outcome

The MRN process ensures that the material received from the supplier is properly verified and recorded in the system. Any rejected or replacement quantity identified during quality checking can then be recorded separately against the respective MRN.

This creates a clear and traceable flow from procurement and material receipt to quality verification and rejection processing.